The Seko works occupy an area of approximately 60,000 m2 where its entire production is designed and developed.
The site in Curtarolo (Padua) comprises the offices, production, and machine and spare parts distribution centre equipped with the latest IT facilities and efficient communication systems to respond promptly to the needs of the users and of the comprehensive distribution network.

Unifeed/Ecoline
division machine park

Parco componenti
impianti Biogas

Area
Spedizioni

Produzione
Macchine
Unifeed
EcoLine

Ufficio
Acquisti / Produzione

PRODUZIONE IMPIANTI
BIOGAS - GRUPPI
COGENERAZIONE

Technical Department
/Analysis Laboratory

Testing circuit

Painting
department

Spare parts
warehouse

Commercial
/Administrative area

Production components warehouse

Unifeed/Ecoline division machine park

  • Surface area 10,000 m2.
  • Area for finished machines ordered by customers, ready for shipping

Agripower division plant components park

  • Surface area 10,000 m2.
  • Area for finished parts for biogas plants under construction.
  • Cogeneration unit testing area.

Shipping area

  • Lorry and container loading
  • For the home market, delivery and testing with our vehicles and specialist personnel

Unifeed + Eco Line machine production

  • Surface area 7,000 m2
  • Cutting and bending of semi-finished parts.
  • Semi-finished component assembly lines.
  • Finished machine assembly lines.

Production
Purchasing Department

  • Surface area 500 m2.
  • Production Procurement/ Planning

Agripower division plant production

  • Surface area 10,000 m2.
  • Area for finished machines ordered by customers, ready for shipping

Technical Department/
Analysis Laboratory

  • Surface area 500 m2
  • Design and development of biogas plants, cogeneration units.
  • Design and development of Unifeed mixing wagons and waste management machine.
  • Biogas plant infeed/outfeed product analysis for biological process control.

Testing circuit

  • Surface area 10,000 m2.
  • Machine testing area to guarantee maximum dependability, performance and safety.

Painting department

  • Surface area 3,000 m2.
  • Washing and liquid painting booths.
  • Powder painting plant.

Spare parts warehouse

  • Surface area 3,000 m2.
  • Computerised management.
  • Constant availability of original spare parts for ultra-quick delivery.

Commercial
and administrative area

  • Surface area 2,000 m2.

Production components warehousee

  • Surface area 5,000 m2.
  • Computerised management
  • Pallet truck and fork-lift handling system.
  • • Extensive availability of main components ensuring strong production capacity.

News & Events

Space - Rennes - 13-16 September
Sommet de l'Élevage - Clermont Ferrand - 05-07 October

Read »

SEKO Bio-Chopper-Composting equipment SAMURAI 5 series
The formidable machines for the processing of any waste material.
Read the experience of a British green area manager.

Read »